|
Automat coal
Warm water 95°C
|
|
|
|
|
|
Automat Steam coal
0,5bar
|
|
|
|
|
|
Output
power
|
100kW
|
120kW
|
140kW
|
180kW
|
300kW
|
Automat with FEEDLAN
system |
|
|
A0. External hopper
A1. Feeder auger
A2. Connetction tube
A3. Feeder door
A4. Dispenser auger
A5. Vibrator
A6. Cyclone auger
A7. Flying ash tube
A8. Ash cleaner auger
A9. Ash collecting head
A10. Ash auger
A11. Ash tube
A12. Ash container
|
|
|
A120kW with central screw hopper(12m3), ash bin(110liter)
and pellet loader
A300kW with moving floor container(20m3) and ash
container(4m3)
Moving floor
container
Fuel hoppers
Ash bins
More
installation samples
Sample, A300 BIO with moving floor, School heating
VIDEO
The boiler house and the moving floor
A300kW with moving floor(30m3) and ash bin(110liter).
A300kW with moving floor upper view
A300kW with moving floor upper view
A140 kW with moving floor upper view300kW
with moving floor upper view
|